Home» Divisions» Services Division» Testing & Commissioning Department

Performs Testing & Commissioning of Substation Equipments.

Activities include :

MV / HV / EHV CABLES

Voltage Withstand Test for Power Cables after Installation:

 - Insulation Resistance Test
 - DC Pressure Test / VLF Test as per Client requirement
Sheath Test at 12KV DC to check integrity of HV/EHV Cables after installation. Sheath Fault Location for HV / EHV Cables (Cables coated with Graphite)
Cable Conductor Fault Location    

            Distribution / Power transformers

Turns Ratio Test Vector Group Test Percentage Impedance test
Excitation Current Test Polarization Index Magnetic Balance Test
Transformer Oil Analysis Winding Resistance Test Capacitance & Tan-Delta Test
Insulation Resistance Test Transformer Protection Devices Function Test. Sweep Frequency Response Analysis

Transformer Oil Filtration Machines (Mineral oil & Silicone Oil) of various capacities (1200LPH, 2400LPH, 4500LPH & 6000LPH) for filtration of Transformer Oil.


LV/HV Switchboards includes:

1. Current Transformer Testing

Turns Ratio Polarity Test Excitation characteristics (Vkp)
Winding Resistance of Secondary Winding Insulation Resistance Test of Secondary Winding


2. Voltage Transformers

Voltage Ratio Polarity Test Insulation Resistance Test Winding resistance of HV & LV Windings


3. Busbars

Torque Test Contact Resistance Test Insulation Resistance Test & Power Frequency Withstand Test


4. Circuit Breakers

Contact Resistance Test Breaker Timing Test Insulation Resistance Test
Power Frequency Withstand Test    


5. Secondary Injection Test of Protection relays (Electro-Mechanical, Static & Numerical Relays)

6. Scheme Check (Functional & Interlocks)

7. Wiring Check by Primary Injection

8. System Integrity Check (Transformer / Cable / Motor Differential Stability & Transformer REF Stability)


UPS / Battery Banks

Charging Battery Capacity Test using Load Banks Re-Charging


DG Sets

Load Test on DG Sets