KEMCO is one of the leading and qualified Grade ‘1st’ Electrical KAHRAMAA Distribution Contractor with vast experience in the respective fields.
The major services consist of Trench Excavation, HV & LV Cable Laying in Trenches, Road crossing by open cut method , Road crossing by HDD , 11KV HV & LV Cabling, Jointing & Termination Services, Main Distribution Work, Extension of LV Underground Network and Service Connections, HV & LV Reinforcement Works, Direct Service Connection, Installation of Energy Meters, Installation, Testing & Commissioning of 11KV Switchgear, VCB & SF6 Type RMU, Feeder Pillars, 11 KV Cables & Energizing of Indoor & Outdoor Sub-Stations up to 11KV .
The following are the major activities involved in the Distribution projects.
|
Trench Excavation. |
|
Installation of Generators & Associated Cables. |
|
|
HV/LV Cable jointing & Termination Works. |
|
Installation of Package Substations. |
|
|
Construction of Road Crossing by Horizontal Directional Drilling/Open Cut Method. |
|
Substation Earthing Works. |
|
|
HV + PILOT/LV Cable Installation. |
|
Control Cable Installations. |
|
|
Replacing/Re-Routing of Cables. |
|
Distribution Substation Electrification Works. (MICC Wiring) |
|
|
Carrying Out Damage Repairs of Cables. |
|
Fixing of Cable Trays, Ladders & Support Structures. |
|
|
Replacement/Installation of Substation Equipments. (Transformers, HV Panels, RMU, Feeder Pillars/MV Panels) |
|
Installation of Fire Retardant Paint on Cables. |
|
|
Installation of Battery Chargers, Marshalling Box & Tripping Cables. |
|
Installation of Fire Retardant Sheets. |
|
|
Relocation of Distribution Substations. |
|
Duct Sealing Works Inside Substations. |
|
|
Construction of Distribution Substations. |
|
|
|